DTS XD10 Spezifikationen Seite 124

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 152
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 123
XD10 Cinema Media Player, Installation and Operating Guide Version 1.0
G.5. Subtitle Projector Installation
The subtitle projector installation consists of two pieces of hardware: c Projector (DTS-CSP),
d external mask assembly (DTS-EMA), which includes hardware for mounting to the projector booth
wall or ceiling. Most installations will occur in the projection booth. If no other alternative exists, the
projector may be installed in the auditorium.
Note: The DTS-CSP Subtitle Projector MUST be installed upside down.
When installing projector, ensure there is easy access for cleaning the lens and changing the
lamp.
An assistant is needed to help hold the projector when it is attached to the mount.
G.5.1. Installation Tools
Adjustable wrench Drill with ¼ inch (6.3 mm) bit
Various screwdrivers Hex driver 5/32 inch (13.1 mm)
16 mm socket wrench
PRECAUTIONS
It is the installer’s responsibility to evaluate the area selected for mounting the DTS-CSP projector.
Special care must be taken when mounting the projector to the wall. The correct fasteners and a wall
rated to support 25 lbs. (9 kg) must be chosen. The composition and strength of the wall must be
evaluated so that the proper fasteners are used. Adequate reinforcement should be added if the wall
is not strong enough. Consultation with a carpenter is highly recommended. Also, when not using
the DTS mount, consult a carpenter to construct appropriate mounting for the DTS-CSP.
To avoid overheating of the projector, adequate airspace is required. Six inches (15.24 cm) are
required on all sides (left, right, front, and rear) and 12 inches (30.98) is required above and below.
A second person is necessary to hold and support the projector in place during the tightening
p
rocedure.
Failure to follow the procedure set forth in this manual will void the warranty, if any, provided by
DTS with respect to the DTS-CSP subtitling projector.
The installer shall be responsible for any injury or damage resulting from installer’s failure to follow
p
rocedure set forth in the manual, and DTS shall have no responsibility wha
t
-so-ever for any injury
or damage resulting from installer’s failure to follow procedure set forth in this manual.
G.5.2. Installation Procedure
Use this procedure to install the subtitle projector into the projection booth.
1. Verify you have all hardware needed for the DTS-CSP installation.
One DTS-EMA mask/mount adapter and one DTS-CSP subtitle projector.
One bracket, wall mounting plate, and arm for mounting the CSP/EMA to the wall.
2. Assemble the bracket and arm to the DTS-EMA.
a. Connect the arm assembly to the DTS-EMA. Place mounting foot so that arm can pivot
upward.
Cinema Subtitling (CSS) Option Document #: 9301E692001.0
G-8
Seitenansicht 123
1 2 ... 119 120 121 122 123 124 125 126 127 128 129 ... 151 152

Kommentare zu diesen Handbüchern

Keine Kommentare